To mark the 100th anniversary of the Mariendom in Linz, the new Domcenter was created as a central hub for visitors. Today, the space serves as an information and reception center and is also used for dining purposes.
HAINZL Gebäudetechnik installed all of the electrical systems. In addition to basic installations, innovative lighting systems and emergency lighting were installed, the bell control system was upgraded, and additional exhibition spaces were connected to the system. Finally, a load management system was integrated to enable efficient monitoring and control of the facility.
Project period: 2023 to 2024
Image source: Diocese of Linz, Linz Cathedral
