<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Office and commercial space - hainzl.at</title>
	<atom:link href="https://www.xn--hainzl-gebudetechnik-kzb.at/en/referenzen-kategorie/office/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.xn--hainzl-gebudetechnik-kzb.at</link>
	<description></description>
	<lastBuildDate>Fri, 23 Oct 2026 06:13:39 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://www.xn--hainzl-gebudetechnik-kzb.at/wp-content/uploads/2024/10/cropped-HIS232024_Logo-Favicon-H-32x32.png</url>
	<title>Office and commercial space - hainzl.at</title>
	<link>https://www.xn--hainzl-gebudetechnik-kzb.at</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Dynatrace Engineering Headquarters, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/dynatrace-engineering-headquarters-linz-2/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Wed, 21 Oct 2026 09:21:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.xn--hainzl-gebudetechnik-kzb.at/?post_type=referenzen&#038;p=4185</guid>

					<description><![CDATA[With the new office building at the 25er Turm, Dynatrace’s engineering headquarters in Linz has...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">With the new office building at the 25er Turm, Dynatrace’s engineering headquarters in Linz has been expanded. The new building offers space for approximately 1,500 workstations as well as modern infrastructure for work, collaboration, and support.<br>For the building’s electrical systems, Dynatrace relied on the expertise of HAINZL Gebäudetechnik. The scope of services included the entire electrical infrastructure, modern lighting systems, security and communications technology, and building automation solutions.<br><br>Construction period: 2024 to 2026<br><br>Photos: © Gregor Hartl Fotografie</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Kleider Bauer, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/kleider-bauer-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Wed, 21 Oct 2026 09:18:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.xn--hainzl-gebudetechnik-kzb.at/?post_type=referenzen&#038;p=4183</guid>

					<description><![CDATA[The renovation of the Kleider Bauer store on Linzer Landstraße resulted in a modern flagship store...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The renovation of the Kleider Bauer store on Linzer Landstraße resulted in a modern flagship store for the Austrian fashion company, spanning more than 3,000 m² of retail space.<br>HAINZL Gebäudetechnik was responsible for the electrical engineering aspects of the redesign. Modern lighting and electrical engineering solutions provide a functional infrastructure and contribute to a high-quality shopping atmosphere.<br><br>Project period: 2025–2026</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>TECHBASE Office Building, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/techbase-office-building-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Wed, 21 Oct 2026 08:23:00 +0000</pubDate>
				<guid isPermaLink="false">https://www.xn--hainzl-gebudetechnik-kzb.at/?post_type=referenzen&#038;p=4187</guid>

					<description><![CDATA[With the TECHBASE in Linz, a modern innovation and technology campus was built in several...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">With the TECHBASE in Linz, a modern innovation and technology campus was built in several construction phases, offering companies and research institutions flexible office space, workshops, and open-plan areas. This large-scale project was realized as a forward-looking hub for technology, innovation, and business development.<br>HAINZL Gebäudetechnik was involved in the project from the very beginning and was responsible for the complete electrical systems for all four building sections. Extensive electrical building services were implemented across multiple construction phases. Through this project, HAINZL was able to further expand its successful collaboration with the client, Neuson Real, and make a significant contribution to the technical infrastructure of the innovation campus.<br><br>Project period: 2021–2025</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>HAB1 Office Building, Perg</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/hainzl-buildings-technology-as-a-reliable-partner-for-the-new-habau-headquarters-hab1/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Mon, 28 Oct 2024 08:50:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=2114</guid>

					<description><![CDATA[With its new HAB1 corporate headquarters in Perg, the HABAU GROUP has created a modern office...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">With its new HAB1 corporate headquarters in Perg, the HABAU GROUP has created a modern office building that offers a contemporary work environment for approximately 200 employees across about 5,200 m². HAINZL Gebäudetechnik was responsible for the electrical engineering work as part of the project.<br>HAINZL Gebäudetechnik was responsible for the electrical engineering work throughout the entire renovation, which took place while operations continued. Of particular importance was the installation of the electric vehicle charging infrastructure, which makes a significant contribution to the HABAU GROUP’s sustainability goals.</p>



<p class="wp-block-paragraph">Contract period: 2023 to 2024<br>Contract value: approx. EUR 1.4 million</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Green Business Center, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/green-business-center-linz-2/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Mon, 21 Oct 2024 09:25:00 +0000</pubDate>
				<guid isPermaLink="false">https://www.xn--hainzl-gebudetechnik-kzb.at/?post_type=referenzen&#038;p=4189</guid>

					<description><![CDATA[The Green Business Center in Linz is a modern office building developed by the Green Finance Group,...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The Green Business Center in Linz is a modern office building developed by the Green Finance Group, featuring approximately 7,900 m² of usable space and 180 workstations. Special attention was paid to sustainable construction methods and a future-oriented energy and mobility infrastructure.<br>HAINZL Gebäudetechnik was responsible for the electrical engineering aspects of the project. The scope of work included high- and low-voltage installations, lighting and security systems, as well as communications, fire alarm, and access control systems. In addition, the building’s electric vehicle charging infrastructure was installed.<br><br>Construction period: November 2021 to September 2023<br>Contract value: approx. EUR 2.3 million, excluding VAT</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>WM Austria Fahrzeugteile GmbH, Graz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/state-of-the-art-offices-and-storage-space-for-wm-austria-fahrzeugteile-gmbh/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:50:51 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=977</guid>

					<description><![CDATA[WM Austria Fahrzeugteile GmbH and a leading electric car manufacturer are now direct business...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">WM Austria Fahrzeugteile GmbH and a leading electric car manufacturer are now direct business neighbors in Graz. WM Austria Fahrzeugteile GmbH is one of the most efficient wholesalers for automotive parts, tires and tool equipment in Europe. In cooperation with the world's most successful electric car manufacturer, ultra-modern offices and storage space for future orders have been created in recent months.</p>



<p class="wp-block-paragraph">HAINZL Gebäudetechnik's scope of services includes the project planning and execution of the entire electrical engineering, the complete low-voltage distribution, the high- and low-voltage installations, the LAN cabling (network technology), the entire interior and exterior lighting, the emergency lighting, the fire alarm system and all earthing and lightning protection measures. E-charging stations also ensure greater sustainability.</p>



<p class="wp-block-paragraph">Due to the previous successful cooperation, WM Austria Fahrzeugteile GmbH also relied on the expertise of HAINZL Gebäudetechnik for this order.</p>



<p class="wp-block-paragraph"><strong>Execution period:</strong>&nbsp;08.2023 - 04.2024</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Police Headquarters, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/police-headquarters-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:48:32 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=973</guid>

					<description><![CDATA[The new police headquarters in Gruberstraße is a state-wide showcase project - from April 2023,...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>The new police headquarters in Gruberstraße is a state-wide showcase project - from April 2023, all police work in Upper Austria will be coordinated from there. HAINZL Gebäudetechnik proved its expertise in the impressive technical design and media technology of the building.</strong></p>



<p class="wp-block-paragraph">Our scope of services included the low-voltage main distribution, the lighting technology including emergency and safety lighting, a UPS and fire alarm system, the intercom system, the network cabling as well as the clock system and the cabling of the media technology. In addition, HAINZL Gebäudetechnik was responsible for the KNX BUS system, the public address system for evacuations, the emergency power generator, the lightning protection system and the e-charging stations.</p>



<p class="wp-block-paragraph">Contract period: June 2020 - December 2022<br>Contract volume: EUR 1,420,000.00</p>



<p class="wp-block-paragraph">Further projects of the Building Services business unit can be found&nbsp;<a href="https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/references?filter=2306">here</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Held&#038;Francke, Vienna-Strebersdorf</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/heldfrancke-vienna-strebersdorf/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:45:37 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=967</guid>

					<description><![CDATA[Recently, a 3-story, architecturally sophisticated office and operations building of the...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Recently, a 3-story, architecturally sophisticated office and operations building of the construction company Held&amp;Francke as well as a 5-story crew quarters for about 90 employees went into operation in Vienna-Strebersdorf. HAINZL is responsible for the electrotechnical equipment at the new location and scores again with the precise planning for the sophisticated installation in exposed concrete. Our high level of planning competence and seamless, cooperative partnership with the other trades was once again demonstrated in this project.</strong></p>



<p class="wp-block-paragraph">The scope of services provided by HAINZL Gebäudetechnik included, among other things, the complete low-voltage distribution, high-voltage and low-voltage cabling, LAN cabling (network technology), delivery and installation of all lighting, emergency lighting and the installation of a fire alarm system, as well as the complete grounding and lightning protection system.</p>



<p class="wp-block-paragraph"><strong>Execution period: 04.2021 - 08.2022<br>Contract volume: approx. EUR 1,100,000 excl. VAT.</strong></p>



<p class="wp-block-paragraph">Learn more about this project&nbsp;<a href="https://www.xn--hainzl-gebudetechnik-kzb.at/en/news/held-francke-location-in-vienna-strebersdorf-equipped-with-hainzl-building-technology-news-2673">here</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Habau-Group, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/habau-group-linz-2/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:43:14 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=963</guid>

					<description><![CDATA[The HABAU Group relied on HAINZL's expertise to implement the building services projects for its...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>The HABAU Group relied on HAINZL's expertise to implement the building services projects for its new Linz location. The new, four-story Linz location HAB25 on Franzosenhausweg impresses with ultra-modern and flexible office space, spacious meeting and training rooms, as well as its own gym and a large green roof terrace.</strong></p>



<p class="wp-block-paragraph">HAINZL scored in this modern architecturally striking office building with 8,200 m² of usable floor space primarily with sophisticated visual installation. The scope of services provided by HAINZL Gebäudetechnik included, among other things, the complete low-voltage distribution, high-voltage and low-voltage cabling, LAN cabling (network technology), delivery and installation of all lighting, emergency lighting, the installation of a fully automatic fire alarm system, as well as extensive building automation. In addition, HAINZL Gebäudetechnik was responsible for the installation of the required e-mobility in the form of e-charging stations, as well as the cabling work for the access control, alarm system and extensive MSR systems.</p>



<p class="wp-block-paragraph"><strong>Execution period: 11.2020 - 07.2022</strong><br><strong>Contract volume: EUR 1,800,000 excl. VAT.</strong></p>



<p class="wp-block-paragraph">Learn more about this project&nbsp;<a href="https://www.xn--hainzl-gebudetechnik-kzb.at/en/news/habau-group-relies-on-hainzl-gebaudetechnik-news-2641">here</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Office Building at 25er Turm, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/office-building-at-25er-turm-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:39:39 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=956</guid>

					<description><![CDATA[In the Linz harbour district&#160;a new seven-storey building enriches the cityscape and...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>In the Linz harbour district&nbsp;a new seven-storey building enriches the cityscape and offers&nbsp;</strong><strong>with around 11,000 m² of usable space</strong><strong>st</strong><strong>ate-of-the-art offices for around 500 Dynatrace employees. Regarding the electrical engineering of the building, the client, Neunteufel GmbH, relied on HAINZL Building Technology.</strong></p>



<p class="wp-block-paragraph">HAINZL installed the entire electrical engineering in the building complex. This specifically includes the complete low-voltage distribution system, the high-voltage and low-voltage installations, the LAN cabling (network technology), the entire lighting in state-of-the-art LED technology including emergency lighting, a parking guidance system and e-charging stations. In addition, there is the installation of building automation for the entire building, a fire alarm system, video system, an access system and an alarm system.</p>



<p class="wp-block-paragraph"><strong>Service period: 2018&nbsp;- 2019<br>Order volume: EUR 2.880.000,-</strong></p>



<p class="wp-block-paragraph">Further projects of the business unit building services engineering can be found&nbsp;<a href="https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/references?filter=2306">here</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Oberbank office building, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/oberbank-office-building-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:36:32 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=950</guid>

					<description><![CDATA[Service period: 2015&#160;- 2016Order volume: EUR 2.200.000,- Scope of services: Low-voltage...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Service period: 2015&nbsp;- 2016<br>Order volume: EUR 2.200.000,-</p>



<p class="wp-block-paragraph"><strong>Scope of services</strong>:</p>



<figure class="wp-block-table"><table><tbody><tr><td>Low-voltage switchgear</td><td>High &amp; low-voltage installation</td></tr><tr><td>Interior &amp; exterior lightning</td><td>Grounding &amp; lightning protection systems</td></tr><tr><td>Emergency lightning</td><td>LAN-installations</td></tr><tr><td>Communication technology</td><td>Barriers system</td></tr><tr><td>Fire alarm system</td></tr></tbody></table></figure>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Regional Administrative Court, Linz</title>
		<link>https://www.xn--hainzl-gebudetechnik-kzb.at/en/business-units/referenzen/regional-administrative-court-linz/</link>
		
		<dc:creator><![CDATA[Nadine Durstberger]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 06:34:11 +0000</pubDate>
				<guid isPermaLink="false">https://www.hainzl.at/?post_type=referenzen&#038;p=947</guid>

					<description><![CDATA[Service period: 2014 - 2015Order volume: EUR 800.000,- Scope of services: Low-voltage switchgear...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Service period: 2014 - 2015<br>Order volume: EUR 800.000,-</p>



<p class="wp-block-paragraph"><strong>Scope of services</strong>:</p>



<figure class="wp-block-table"><table><tbody><tr><td>Low-voltage switchgear</td><td>High &amp; low-voltage installation</td></tr><tr><td>Interior lightning</td><td>Grounding &amp; lightning protection systems</td></tr><tr><td>Emergency lightning</td><td>Building automation</td></tr><tr><td>LAN-installations</td><td>Fire alarm system</td></tr><tr><td>Infrastructure for safety technology</td></tr></tbody></table></figure>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
